Acceptance Criteria and Traceability
How do you know the finished work meets the request? In a standard cycle, Scoper
gives each checkable outcome an ID, such as AC-001. Later roles use that same
ID in the design, implementation plan, and assessment reports. This connection
between requirements and evidence is called acceptance traceability.
Documentation cycles use the same stable identifiers for documentation outcomes.
Architect establishes existing technical coverage, Documenter records checked
evidence, and final Reviewer and Synchronizer independently assess its
sufficiency and applicability; no current-cycle Tester record is required.
Expedited work is checked against the saved request instead. If it becomes standard work, Scoper creates the acceptance conditions when the workflow reaches Scoping.
How Scoper assigns IDs
Section titled “How Scoper assigns IDs”Scoper writes the acceptance conditions: statements of what must be true for the work to count as done. Each gets an ID that is unique within the cycle.
Outcomes checked at different steps need separate conditions. For example:
AC-001: A user can export the selected records as a CSV file.AC-002: The user guide explains how to export records.
Each condition is a list item that starts with its ID, as above. A table row, heading, or sentence that mentions an ID does not define a condition, and the workflow check reports an ID the scope mentions without defining it.
Tester can check the export behavior before Documenter finishes the guide. Combining both outcomes under one ID would make their progress harder to judge.
Scoper owns what each condition means. Other roles refer to it; they send unclear or incorrect requirements back to Scoper.
Connect the design and implementation
Section titled “Connect the design and implementation”Architect accounts for every current acceptance ID, explaining how the design or existing technical behavior supports it. Developer uses the same IDs to connect implementation steps to the requirements.
Some conditions need no technical design. For AC-002 above, Architect can
record No architectural impact and identify the documentation work it
depends on. That label cannot excuse missing design for a technical requirement.
Follow the evidence
Section titled “Follow the evidence”Tester accounts for every current condition with results, a reason it cannot yet be verified, or a dependency on a later role. Tests that were not run and Developer’s own checks do not replace Tester’s independent verification.
During an increment assessment, the report keeps the full acceptance inventory.
Conditions waiting on future implementation use AWAITING_IMPLEMENTATION, while
the assigned outcome needs sufficient current evidence. Before Reviewer, full
verification must resolve all such implementation gaps. Earlier increment
results count only while their supporting inputs remain valid.
A later dependency may remain open during implementation review only when the
condition actually depends on that later work. For example, AC-002 can wait
for Documenter. A failing export test cannot be deferred that way.
With FULL_DELIVERABLE, after documentation, final Reviewer checks that every
current condition has sufficient evidence. Synchronizer checks that those
assessments still apply to the files being offered for sign-off. Neither role
invents missing evidence or closes another role’s findings.
With IMPLEMENTATION_REVIEWED, implementation Reviewer checks that every
current condition has enough evidence before the cycle can be ready for
sign-off. A permitted later dependency still blocks this shorter finish. If
AC-002 requires a guide, Documenter must provide its evidence through
recovery; choosing the shorter policy does not remove the requirement. See
Finishing After Implementation Review.
The evidence stays in the responsible roles’ records, linked by the same IDs. There is no separate master checklist to maintain. A condition marked pending is still unfinished; all current conditions need sufficient evidence before the cycle can be ready for your decision.
Replanning preserves history
Section titled “Replanning preserves history”When a condition keeps its meaning, it keeps its ID. A new condition or a changed meaning gets a previously unused ID. Removed and replaced IDs are retired, never reused or renumbered within the cycle.
For example, changing “export as CSV” to “export as JSON” replaces the condition; correcting a typo does not.
When requirements change, later roles must revisit any completed work that needs to cover the full set of conditions, even if the code is unchanged.
See the scope template for the record format and the protocol for the full rules.